Origin Solar Partner Plus - Oct'26 (TOU 5 Day with Dedicated Circuit)
Electricity in Victoria, Jemena network. Market offer.
- Estimated a year
- $1,849
- About a quarter
- $462
Current prices
| Charge | Price incl. GST | Applies to |
|---|---|---|
| Controlled load usage | 21.41c/kWh | Controlled Load |
| Solar feed-in tariff | 12c/kWh | first 8 kWh a day |
| Solar feed-in tariff | 1c/kWh | after that |
| Daily supply charge | 129.77c/day | Period |
| Usage (shoulder) | 34.39c/kWh | MON TUE WED THU FRI 07:00 to 23:00 |
| Usage (shoulder 2) | 19.43c/kWh | every day 00:00 to 07:00; every day 23:00 to 00:00; SAT SUN 07:00 to 23:00 |
How the estimate is worked out
- Daily supply charge for 365 days$473.67
- Shoulder usage, 4,000 kWh (100%)$1,375.66
Assumptions:
- Time-of-use split: 100% shoulder wherever the plan has those windows. Change the split if you know your own pattern.
- Usage of 4,000 kWh a year, a reference figure used to compare plans on equal terms.
- Usage is spread evenly across the year and across each season.
- All prices include GST. Feed-in credits do not attract GST.
Limitations:
- This is an estimate. Your actual bill depends on when and how much energy you use, future price changes and whether you meet the plan's eligibility rules.
- This plan also has Shoulder 2 rate windows. We assumed none of your usage falls in them.
Offers
- Solar feed-in tariffs
- Solar feed-in tariffs
- Solar feed-in tariffs
Solar
This plan pays a retailer feed-in tariff of 12c/kWh for energy you export.
Compare feed-in tariffs · Solar payback estimate
Contract, fees and eligibility
- Contract
- No fixed term stated
- Exit fee
- None listed
- Price changes
- We may vary the Charges (including their amount, nature and structure) by notice to you at any time. The notice will be at least 5 business days prior to the effective date of the variation.
- When it ends
- We'll give you notice before your contract ends. At the end of the contract term, we will continue to sell you energy and the terms and conditions of the Standard Retail Contract will apply, unless you tell us otherwise.
Who can sign up:
- To be eligible your solar PV system must be net metered and must not be receiving a government funded feed-in tariff. You must purchase an eligible solar PV system from an Origin approved solar installer. If you remove your solar PV system from the supply address during the benefit period the offer
Other fees the provider may charge
- $2.15: other: $2.15 (incl GST) applies for each paper bill.
- $101.52: disconnection: A $101.52 (GST Incl) fee may apply when your property is disconnected (including when you move). This fee is passed through from your distributor and may vary.
- $70.79: reconnection: A $70.79 (GST Incl) fee may apply when your property is reconnected (including when you move). This fee is passed through from your distributor and may vary. Pl
- $2.70: payment processing: If you pay at an Australia Post outlet, a payment processing fee of the higher of $2.70 or 0.49% (incl GST) may apply.
- Tariff type
- time of use
- Payment options
- paper bill
- Billing
- quarterly
- GreenPower option
- Controlled load available
Price history
One price recorded so far, effective 30 September 2026. History builds as the plan changes.
Changes to this plan
No changes recorded since we started tracking this plan.
Data source
- Source
- Energy plans: Consumer Data Right (AER)
- Last checked
- 7 October 2026
- Plan ID
- OR2800657MR@VEC
- Official provider
- Origin Energy website
Think this information is incorrect? Tell us
Related
Plan terms as published
When the Energy Plan ends, you'll receive our standard retailer feed-intariff published on our website. Not available in all areas or property types. Residential customers only. See originenergy.com.au/2889/Terms-and-conditions for more